Skip to content

Documentation strategy

Vouchor documentation has three tiers for three different readers. All tiers are Markdown in this repository and render on the documentation site (Zensical); the site never holds content that is not in Git.

Tier Reader Question it answers Location Site section
Tier 1 — Product Anyone: users, decision makers, curious visitors What is Vouchor and why should I care? README.md, docs/index.md Home
Tier 2 — Use it People who want to run Vouchor and get things done How do I set it up and use it for real tasks? docs/guide/ Guide
Tier 3 — How it was built Software engineers learning to build such a system How was this built from zero to completion, and why this way? docs/build/ (journal) + docs/project/ (reference) + specs/ Build journal, Engineering reference

Tier 1 — Product

Plain language, no jargon without explanation, no code beyond a three-line quickstart. Must stay honest about project status. Content: problem, promise (the six guarantees in plain words), how it works (one diagram), use-case highlights, local-first and self-hosted story, status and roadmap, links to Tier 2 and Tier 3.

Tier 2 — Use it (guide with demonstrations)

Task-oriented walkthroughs. Every walkthrough shows the request, what Vouchor verifies, the approval screen, the result, and the read-back proof. Each walkthrough is backed by an e2e test so it cannot silently rot.

Page Content Delivered in
guide/index.md What you can do; how a request flows P0 (outline)
guide/install-local.md Docker + uv, make setup up, choosing an LLM P0
guide/first-request.md Create a thread, review, approve, read the report P1
guide/connect-google.md Create your own Google OAuth client, scopes, vouchor connect google P5
guide/use-cases/send-email-gmail.md Send email through Gmail, see Message-ID read-back P5
guide/use-cases/read-email.md Search and summarise your inbox (read-only, no approval needed) P5
guide/use-cases/schedule-calendar-event.md Create a Google Calendar event; idempotent event IDs P5
guide/use-cases/add-note-keep.md Add a note to Keep; API vs browser fallback P5
guide/use-cases/vendor-outreach.md The seven-vendor batch scenario end to end P5
guide/approvals.md Approve, reject, edit; what happens on failure P1, P5
guide/deploy-cloud.md Deploy with OpenTofu + Helm to kind or a cloud P7
guide/troubleshooting.md Common errors, reading the ledger P5–P7

Tier 3 — How it was built

Two complementary parts:

  1. Build journal (docs/build/) — a narrative, chronological, reproducible account. One chapter per phase, written at the phase's converge step, covering: goal, design decisions and the alternatives rejected (linking ADRs), the code walk-through of key modules, the tests that prove it (with their commands), what went wrong and how it was fixed, and the exact commit/tag where the chapter ends so a reader can check out and follow along.
Chapter Phase
00-the-idea-and-the-blueprint.md Before P0
01-foundation-and-walking-skeleton.md P0
02-contracts-ledger-and-durable-hitl.md P1
03-exactly-once-execution.md P2
04-ground-truth-verification-and-browser.md P3
05-reports-and-memory.md P4
06-real-integrations-gmail-calendar-keep.md P5
07-production-hardening.md P6
08-cloud-deployment-and-release.md P7
  1. Engineering reference (docs/project/, specs/) — the canonical CraftRail records: requirements, architecture views, ADRs, contracts, feature specs and verification evidence. The journal links into these rather than duplicating them.

Rules

  • Tier 1 claims must be true for the current release; planned features are labelled "planned".
  • A Tier 2 page ships only with its backing e2e test.
  • A journal chapter is written when its phase closes and is not rewritten later; corrections are added as dated notes.
  • The CraftRail framework guides in docs/framework/ remain available as the "Engineering workflow" section.