Skip to content

Functional requirements

Derived from the ATEP blueprint. Status proposed until the owner approves. "Phase" refers to the implementation plan.

ID Requirement Rationale/source Acceptance / verification Status
FR-001 The system MUST resolve every capability through a registry that lists handlers per tier (1 Connector, 2 Skill, 3 Browser, 4 Sandbox) and select the lowest healthy, configured tier first. Invariant 1 Unit tests on registry selection; Phase 2 proposed
FR-002 Each capability MUST declare a consequence level (READ_ONLY or CONSEQUENTIAL); a CONSEQUENTIAL capability MUST declare a read-back verifier for every tier it can execute on. Invariants 4, 5 Registry load fails on violation; Phase 1 proposed
FR-003 On a retriable tier failure the system MUST record a RouteAttempt (tier, tool, time, error type, message) in the ledger and retry on the next configured tier. Invariant 1 Integration test "cascading fallback"; Phase 2 proposed
FR-004 When all executable tiers fail, the system MUST fall back to Tier 4 and produce a ready-to-use local artifact (e.g. .eml, .ics, .csv) unless the capability forbids it, and MUST report the inability clearly. Invariant 1 Integration test; Phase 2 proposed
FR-005 Search results (SearXNG) MUST be typed as untrusted pointers and MUST NOT be accepted as a verified dependency of a staged action. Invariant 2 Type-level + unit tests; Phase 3 proposed
FR-006 Every critical entity attribute used by a staged action MUST be verified from a live source (direct API or live DOM) and stored with source URI, method, raw evidence snippet and timestamp. Invariant 2 Integration test against mock storefront; Phase 3 proposed
FR-007 When a live source contradicts a search snippet, the verifier MUST use the live value and record the discrepancy. Invariant 2 Integration test "stale snippet"; Phase 3 proposed
FR-008 Verified attributes MUST carry a freshness window per attribute type; expired attributes MUST be re-verified before staging. Invariant 2 (freshness) Unit test with frozen clock; Phase 3 proposed
FR-009 Discovery, verification and drafting for all targets in a batch MUST complete before any human approval is requested. Invariant 3 Graph test: no interrupt before staging finishes; Phase 1 proposed
FR-010 A batch containing one or more consequential actions MUST suspend at exactly one consequence-gate checkpoint presenting all drafts and their verified metadata. Invariant 4 Graph test "7 vendors, 1 interrupt"; Phase 1 proposed
FR-011 At the gate the user MUST be able to approve, reject, or edit each staged action individually; edits MUST be re-validated before execution. Invariant 4 API + graph tests; Phase 1 proposed
FR-012 Suspended threads MUST survive process restarts and resume from the persisted checkpoint. Durability Integration test: kill and resume; Phase 1 proposed
FR-013 Every consequential action MUST have a deterministic idempotency key and a ledger row whose status follows the allowed state machine (STAGED → APPROVED → ATTEMPTED_UNVERIFIED → VERIFIED_SUCCESS / PARTIAL_RECOVERED / FAILED_TERMINAL, or REJECTED_BY_USER). Invariant 5 Property tests on transitions; Phase 1–2 proposed
FR-014 An action MUST be marked successful only after an out-of-band read-back confirms the side effect; a tool's own success response is not sufficient. Invariant 5 Integration tests per connector; Phase 2 proposed
FR-015 Before retrying an ATTEMPTED_UNVERIFIED action, the executor MUST run read-back first and mark PARTIAL_RECOVERED if the side effect exists. Invariant 5 Fault-injection test "timeout after accept"; Phase 2 proposed
FR-016 The executor MUST stamp each side effect with an identifier derived from its idempotency key wherever the target system allows (email Message-ID, calendar event ID, note label) so read-back can match it exactly. Invariant 5; ADR-007 Integration tests; Phase 2, 5 proposed
FR-017 Only one executor MAY run a given idempotency key at a time, across processes and replicas. Invariant 5 Concurrency test with parallel workers; Phase 2 proposed
FR-018 The gateway MUST expose REST endpoints to create a thread, read its state, list staged actions, and approve/reject/edit them. Blueprint Phase 1 OpenAPI contract tests; Phase 1 proposed
FR-019 The gateway MUST stream thread progress events to clients via Server-Sent Events. Blueprint stack Integration test; Phase 5 proposed
FR-020 On termination the system MUST emit a plain-language report derived only from ledger rows (counts per outcome, tier used, recoveries, duplicates = 0). Invariant 6 Unit + golden-file tests; Phase 4 proposed
FR-021 A distiller MUST extract only durable facts (user preference, decision rule, verified entity fact) with confidence ≥ 0.8 and MUST reject candidates describing transient execution. Invariant 6 Unit tests on noise filter; Phase 4 proposed
FR-022 Durable facts MUST be deduplicated by embedding similarity (default threshold 0.92) before upsert. Invariant 6 Integration test with pgvector; Phase 4 proposed
FR-023 A new thread MUST load the top-K (default 5) relevant durable memories during discovery. Invariant 6 Integration test; Phase 4 proposed
FR-024 The system MUST provide capabilities for: sending email, reading/searching email, creating/updating calendar events, and creating notes, each usable through at least one tier. Tier 2 docs use cases Use-case scenario tests; Phase 5 proposed
FR-025 Tier 4 MUST execute generated code only inside an isolated sandbox with no network by default, resource limits, and a writable artifacts directory only. Invariant 1; security Sandbox escape-attempt tests; Phase 5 proposed
FR-026 The gateway MUST authenticate API clients; the approval endpoint MUST only accept the thread owner's credentials. Security API tests; Phase 6 proposed